Built Right From the Ground Up
Lakeland sits in Pointe Coupee Parish, close to the Mississippi River basin. The ground here is heavy alluvial clay and silt loam. It swells when Gulf downpours soak it. It shrinks when the heat comes back. That constant movement is what cracks slabs and shifts foundations.
Native topsoil cannot carry a heavy slab on its own. It holds water, and water builds pressure under your house pad. Without proper sub-grade work, you get settling, cracks, and standing water after every storm.
That is where professional House Pads Services in Lakeland, LA earn their keep. We cut to the correct depth and strip out soft, unstable soil. We lay geotextile fabric to separate and stabilize the base. Then we build the pad with select clay and sand fill that resists moisture swings.
You get a pad that stays level and drains right. Your builder gets a solid base to pour on. You avoid expensive foundation repairs down the road.
C & H Construction Inc is a House Pad Contractor in Lakeland, LA that builds for this soil every day. We know what properties along LA-413 and LA-416 are dealing with. We build to hold.
EXCELLENT Based on 3 reviews Posted on Google SheilaTrustindex verifies that the original source of the review is Google. My bathroom and kitchen remodel turned out great!! Hunter has great attention for detail, and does quality work. He was very helpful throughout the remodel process. Very professional. He has knowledge in all aspects of construction, which was very helpful. I highly recommend him and will definitely be using his company in the future.Posted on Google Joseph GuidrozTrustindex verifies that the original source of the review is Google. Posted on Google Ann MarcelloTrustindex verifies that the original source of the review is Google. We trusted Hunter with our remodel, and we were very happy with it! We trust him again for our new house. He can do it all, and he stands behind his work.
From residential projects to commercial developments, we provide end-to-end solutions for every stage of construction.
As a House Pads Services Company in Lakeland, LA, we follow the same five steps on every lot.
Step 1: Site clearing and root grubbing:
We remove vegetation and roots down to solid base. Nothing organic stays under your pad.
Step 2: Excavation and moisture testing:
We strip soft, unstable topsoil. We check the sub-base moisture before fill goes down.
Step 3: Layered select fill:
We import a non-expansive clay and sand mix. We place it in 6 to 8-inch lifts.
Step 4: Compaction and density testing:
Heavy equipment compacts every lift. We test to meet the standard Proctor density builders require.
Step 5: Laser-guided final grading:
We set the elevation to match your architectural prints. We shape runoff points so water leaves the pad, not pools around it.
The result is a pad your concrete crew can trust. It stays level through wet seasons and dry spells. You skip callbacks and rework.
Our House Pads Services expert crew in Lakeland, LA handles tough ground the right way. Ask about our process before you break ground.
A homeowner near LA-413 had a low lot that held water after every storm. We stripped the soft clay, laid geotextile fabric, and built the pad with select fill in 6 to 8-inch lifts. We compacted each lift and graded swales toward the parish ditch line. The slab went down on a dry, level pad. The builder started on schedule.
A landowner off LA-416 needed a raised pad to meet Pointe Coupee Parish flood elevation requirements. We cleared the site, hauled in select fill, and built it up to the required height. Density tests passed on the first round. We finished with laser-guided grading and silt control so rain would not wash the pad out before the pour. The result: a compliant, stable pad.
It depends on your lot’s flood zone. Parish officials and FEMA maps set the base flood elevation. Your builder or surveyor confirms the number, and we build the pad to that height.
Non-expansive select fill, usually a clay and sand mix. Native alluvial clay swells and fails density tests. We place select fill in 6 to 8-inch lifts and compact each one to meet standard Proctor requirements.
Cost depends on pad size, fill volume, haul distance, and site conditions. Soft or wet ground adds excavation. We do not guess over the phone. Call us for an on-site estimate.
Often, yes. The parish can require drainage and floodplain permits before earthwork starts. Check with the parish permit office first. We build to the elevation and drainage plan your permit sets.
Yes, if the pad is high enough and drained correctly. We raise it with select fill and cut swales to move stormwater toward parish ditch lines. Elevation and drainage come first.