
Built Right From the Ground Up
Building in Lakeland is not like building on high ground. Between False River and the Mississippi River alluvial plain, Pointe Coupee Parish sits on a high water table and dense clay that holds water long after a Gulf storm passes. Put a slab on that without the right prep and you pay for it later. Cracked foundations. Settling walls. Water standing around your house pad every time it rains.
C & H Construction Inc handles residential dirt work and excavation in Lakeland, LA the way this ground demands. We don’t just clear and fill. We read the soil, find the load-bearing layer, and stabilize what sits above it. When clay is too wet to hold, we treat it with lime or soil-cement before a single load of fill goes down. Then we grade so water moves away from your structure, not toward it.
Whether you’re building a home off LA-413, a shop near Ventress, or a commercial lot along the LA-416 corridor, you get a pad that stays put. That means fewer headaches with your builder, a smoother inspection, and a foundation you won’t be worrying about ten years from now.
Please Fill Out Our Form Below
EXCELLENT Based on 3 reviews Posted on Google SheilaTrustindex verifies that the original source of the review is Google. My bathroom and kitchen remodel turned out great!! Hunter has great attention for detail, and does quality work. He was very helpful throughout the remodel process. Very professional. He has knowledge in all aspects of construction, which was very helpful. I highly recommend him and will definitely be using his company in the future.Posted on Google Joseph GuidrozTrustindex verifies that the original source of the review is Google. Posted on Google Ann MarcelloTrustindex verifies that the original source of the review is Google. We trusted Hunter with our remodel, and we were very happy with it! We trust him again for our new house. He can do it all, and he stands behind his work.
From residential projects to commercial developments, we provide end-to-end solutions for every stage of construction.
Every Lakeland site gets the same five-stage process. No skipped steps. No shortcuts that come back to bite you.
Stage one is assessment: We check elevation, soil density, and property lines, and we coordinate parish permits and drainage compliance so your project doesn’t stall at the parish office.
Stage two is clearing and grubbing: Hardwoods, brush, and root systems come out completely. Roots left in the ground rot and leave voids under your pad.
Stage three is subgrade excavation and stabilization: We strip soft topsoil down to load-bearing layers. Where Pointe Coupee clay won’t hold, we use lime or cement treatment or geotextile fabric.
Stage four is grading and pad construction: Laser-guided equipment sets the slope. Select fill goes in and gets compacted in lifts, raising your house pad above local flood stages.
Stage five is drainage and erosion control: Swales, culverts, and silt fencing route rainwater toward parish drainage channels and keep your site from washing out.
The result is subgrade soil stabilization and drainage control you can build on with confidence, whether it’s one house or a full commercial site.
A family bought two wooded acres off LA-413 that held standing water after every rain. Our crew cleared the hardwoods, stripped the saturated topsoil, and treated the clay subgrade with lime. We built the house pad in compacted lifts above the property’s low spots and cut swales to carry runoff to the roadside ditch. Their builder poured the slab on schedule.
A local contractor needed a metal shop pad and gravel yard near Jarreau, with quick access to LA-416 and US-190. Wet clay was pumping under heavy equipment. We laid geotextile fabric, brought in select fill, and compacted each lift with density testing. Culverts and silt fencing tied the site into parish drainage. It passed inspection on the first visit.
We start with soil and elevation checks, then strip soft material down to load-bearing ground. Wet clay gets lime or cement treatment or geotextile fabric. Then we raise your pad above local flood stages and grade water away.
It depends on your lot’s size, location, and nearby drainage. Most projects involve Pointe Coupee Parish permits and drainage review, and sites near wetlands may need more. We help coordinate the paperwork so clearing starts legally and on time.
Cost depends on tree density, how much stabilization the soil needs, and how much fill dirt your pad requires. Lightly wooded, drier lots cost less. Call us for an on-site estimate with a clear, itemized price.
That depends on your property’s flood zone and the parish’s elevation requirements. We check your survey and flood map, then build the pad high enough to meet code and keep water off your foundation during heavy Gulf rain.
Pointe Coupee clay can stay saturated for days. Running heavy equipment too soon causes subgrade pumping and deep ruts. We watch conditions closely, and on tight schedules we use stabilization methods that let work continue safely.